Asbestos How It Works

Asbestos How It Works

Asbestos Testing & Inspections, Asbestos Project Design, & Air Monitoring

CONTACT US

Asbestos: How it Works

  • An ECG project manager will speak with the client to understand their objectives. We will use this understanding to tailor our service to best meet our client’s needs.
  • We will review any previous asbestos-related reports and building plans as needed.
  • One of our IDPH-licensed asbestos inspectors will conduct the asbestos inspection.
  • As soon as laboratory results are available, we will call the client to provide a verbal summary of the findings. Shortly thereafter, we will send a detailed written report to document the asbestos inspection results.
ECG employee checking for asbestos

Asbestos Removal Project Design and Air Monitoring

If asbestos materials are found to be present, and the client decides to have the materials removed, ECG can provide project design and air monitoring services, as needed:
ECG asbestos removal project in progress

For Large Asbestos Removal Projects, ECG Can:

  1. Conduct walk-throughs at the site, as needed.
  2. Obtain asbestos contractor bids for the client.
  3. Monitor the removal work by conducting inspections and collecting air samples.
  4. Conduct final clearance air testing.
  5. Complete a report documenting project activities and results.

For Small Asbestos Removal Projects, ECG Can:

  1. Create an asbestos removal project design manual.
  2. Conduct walkthroughs with licensed asbestos contractors and obtain bids.
  3. Help the client select a contractor.
  4. Monitor the asbestos project by conducting inspections and collecting air samples.
  5. Conduct clearance inspections and collect clearance air samples upon project completion.
  6. Complete a report documenting the project.

For Remaining Asbestos Materials, ECG Can Design an Asbestos Operations and Maintenance Program:

An asbestos operations and maintenance program is designed to:
  • Maintain asbestos-containing materials in good condition.
  • Ensure proper cleanup of asbestos materials follow any disturbances.
  • Prevent further disturbances of asbestos materials.
  • Monitor the condition of ACMs in the facility.